Azarshid Pars Refractories Co. successfully trialed Cold Setting Mix – Tundish Working Lining in two of Iran’s leading integrated steel plants.
The new Tundish CS mix lining improves wear resistance and reduces the tundish preparation time by almost 3–4 hours.
The CS mix does not require dry-up, unlike the conventional slurry mix lining, which requires at least 3 hours dry-up under the gas burner.
Further trials for this innovative mix have been planned in other major steel plants.
Advantages of CS Mix Tundish Lining:
Reduces fuel consumption
Ensures fixed tundish steel volume since lining is done with a template
Self-setting of lining without any heat-up
Uniform lining thickness ensures a smooth surface
Easy application process
Clean work area
Want a trial of CS Mix at your plant? Write to us at Info@aspref.com